Project Description: Casella Waste Management of Massachusetts, Inc., Auburn, MA
Owner: Casella Waste Management of Massachusetts, Inc.
Location: Auburn, Massachusetts
Project Team: Walsh Engineering Associates, Inc.
Work Scope:
WEA was asked to conduct a site drainage analysis, prepare site plans, submit permits, and oversee the removal and replacement of an existing 12,000 gallon double walled underground oil/water separator tank. Local (town of Auburn wetlands Notice of Intent, town stormwater review, and Earth Removal Special Permit) and state (Massachusetts DEP Notice of Intent) permits for this project were obtained along with associated storm drainage improvements and the installation of new oil/water separator control equipment.