Site Improvements
Project Description: Container Storage, Stormwater Improvements and truck scale replacement
Owner: Pine Tree Waste, Inc.
Location: Waterville, Maine
Project Team Walsh Engineering Associates, Inc. (Civil Engineering), Summit Environmental Consultants, Inc. (Project Management), Manter Construction (Contractor)
Work Scope WEA’s scope included civil engineering, permitting assistance (local and state) and construction management of site improvements at an existing solid waste transfer station. These improvements include the development of a 0.5-acre container storage area (for improved site efficiencies) construction of under-drained soil filter for stormwater treatment, stormwater pretreatment at the building approach and replacement of the facility truck scale.